bob博彩公司_申博体育在线-投注*官网

图片

Tokyo University of Marine Science and Technology

About Tokyo University of Marine Science and TechnologyUniversity overview

Tokyo University of Marine Science and Technology was established in October 15 through the merger of Tokyo University of Mercantile Marine and Tokyo University of Fisheries. In order to contribute to the sustainable development of human society, we conduct basic and applied education and research in science and technology related to the ocean.

Application for facility rental

      

[Important / updated on June 5, 10]
Notice of change in rental hours of physical education facilities, etc.

 In order to allow as many people as possible to use the service after applying for a reservation for December, we will change the reservation time slot and usage time as shown below, so please keep this in mind when completing the application process.        
<The usage time of the sports facilities per day shall be limited to 1 hours or less. >
 Within 09 consecutive hours from 00:13-00:4
 13:00-17:00 Same as above
 17:00-21:00 Same as above

[Important / updated on June 5, 8]
Notice regarding the resumption of lending of the Shinagawa Campus Ground (multi-purpose area) (Follow-up report on July 5, 7)

We will resume accepting rentals as the ground leveling work in the "multi-purpose area" has been completed.
(Reservation application form for use of physical education facilities (for Shinagawa, September 5)Please confirm)

[Important / updated on June 5, 7]
Regarding cancellation of facility use due to "heatstroke alert"

The government (Ministry of the Environment and the Japan Meteorological Agency) calls attention to dangerous heat countermeasures and encourages people to take measures to prevent heat stroke. Alert” is announced.

In order to ensure the safety of life and body from the danger of heat stroke, if the cancellation occurs for the reason of heat stroke prevention on the day the government announced the "heat stroke warning alert", we will accept it within 3 days from the date of use. If you contact the person in charge, we will respond in the same way as rain cancellation.

In addition, even if a "heatstroke alert" is issued during use, please contact the reception desk within 3 days from the date of use.We will accept it by shortening the usage time.

[Important / updated on June 5, 7]
Notice regarding rental of the Shinagawa Campus Ground (multi-purpose area) (Follow-up on April 5, 4)

The baseball field, soccer field, rugby field, etc. on the Shinagawa Campus cannot be used as before due to the construction of the new student dormitory and the construction area for the effective land utilization project. The facility is defined as a "baseball field" and a "multi-purpose area". (Lending areas are here.Please confirm)

In a part of this "multi-purpose area", there is a slight step from the track of the former land track, and it is not flat.Although the soil is temporarily replenished and leveled, it may be slightly tilted due to the effects of wind and rain, so please be careful when using it. (Detail is here.Please confirm)

Due to the ground leveling work for these parts, the "multi-purpose area" (rental area) cannot be rented from August 5, 8 to August 1, 5.We plan to resume lending when the ground leveling work is completed.

In addition, the construction section, A section and B section adjacent to the "multi-purpose area" (rental area) will be off-limits from the end of July 5.

We apologize for the inconvenience, and thank you for your understanding and cooperation.

[Important / updated on June 5, 5]

Tokyo University of Marine Science and Technology has implemented various infection prevention measures related to the new coronavirus.We would like to express our sincere gratitude to the general public who use our facilities for their cooperation.

Due to the transition to the 5th category of new coronavirus on May 5, 8, our university will lift all restrictions except for measures on training ships. We ask for your cooperation in continuing basic infection control measures (wearing a mask, hand hygiene such as washing hands, ventilation, avoiding the three Cs, etc.).

[Important / updated on June 5, 4]
Notice of construction at the Shinagawa Campus baseball field and grounds (soccer field, rugby field, track and field track)

On the Shinagawa Campus, the construction of the new student dormitory and the effective use of the land are scheduled for the following period.As a result, baseball fields, soccer fields, rugby fields, etc. will not be able to be used as before due to the construction area.Therefore, in the future, the usage restrictions will change depending on the progress of the construction, so please check the information posted on the website from time to time.

  • The facilities eligible for rental from April 5 will be the "baseball field" and the "multi-purpose area".
  • Restricted use period: During the period from April 5 to around September 4, there may be restrictions on the use of the rental facilities due to the construction period of section A and section B.

We apologize for the inconvenience, and thank you for your understanding and cooperation.

The loan target area is here.
*Updated on March 5, 3 Some revisions have been made to make the article easier to understand.

[Important / updated on June 5, 3]
●Notice regarding facility usage fee revision

We would like to inform you that we have revised the basic loan amount used to calculate the facility usage fee for meeting rooms, classrooms, sports facilities, etc.Please note that there are facilities where the usage fee will change as a result.For details, please check the information for each facility in "2. Details of rental facilities and application destinations".

Loan base amount New (land) 1.2 yen / m0.9403 / h Old (land) XNUMX yen / mXNUMX / h
Loan base amount New (building) 9.9 yen / m9.8946 / h Old (building) XNUMX yen / mXNUMX / h
Effective date From April 5, 4

However, if you apply for facility use by March and use it from April onwards, the old rate will be applied.
Thank you for your understanding and cooperation.

Our university rents out facilities such as conference rooms, classrooms, gymnasiums, and sports grounds to people outside the university to the extent that they do not interfere with education, research, or on-campus events.Please check the contents carefully before applying.
*Nakabe Auditorium on Shinagawa Campus will be excluded from rental facilities for the time being due to various circumstances.

1.Reservation/application method/payment method

(1) Reservation and application method

  • Reservation and application methods differ depending on each facility, so please refer to "2. Details of rental facilities and application destinations" below.
  • After making a reservation, please submit the "Application for Permission to Use Fixed Assets" to the person in charge of application reception by the deadline specified by the university.At that time, please attach materials (brochures, programs, etc.) that show the details of the event.
  • The application form and related materials are as follows.Please check the contents carefully before applying.

*The following items have been changed in the form of the “Application for Permission to Use Fixed Assets” from 2.
○ Addition of an email address entry field
○ Omission of the official seal of the Tokyo University of Marine Science and Technology property manager on the “permit to use fixed assets”
*The usage time stated on the application form includes the time from entering the room to leaving the room (loading in, preparation, cleaning up, and unloading). Use time of less than 1 hour will be rounded up to 1 hour and the facility usage fee will be calculated.Please indicate the hours of use on the application form in units of one hour.
* As a general rule, you cannot use the on-campus parking lot, so please use public transportation.If you need to use a vehicle to bring in your luggage, etc., please fill in the required number of vehicles (up to 5 vehicles) on the "Application for Permission to Use Fixed Assets".However, the application does not guarantee a parking space.If there is no space in the parking lot due to overlap with other groups, please use off-campus paid parking lots.

(2) Payment method

  • After the university receives the "Application for Permission to Use Fixed Assets" and confirms the details of use, the Asset Management Section of the Facilities Division will mail an invoice and a Permission to Use Fixed Assets.Please check the contents of the invoice and transfer the invoiced amount to the designated account by the payment deadline.
    Incidentally,As a general rule, facility usage fees that have already been paid will not be refunded.
    However, this shall not apply in the following cases.
  • When facilities cannot be used or cannot be used due to natural disasters, etc.
  • If you are unable to use it for a university event, etc. after receiving permission to use it
  • When outdoor sports facilities cannot be used due to bad weather such as rain
    (For cancellation due to bad weather, please contact the person in charge of application reception within 3 days from the date of use)
  • When the university refuses to lend the facility due to unavoidable reasons

2.Details of rental facility and application

Shinagawa Campus

Facility The office in charge Procedures, capacity, fees, etc. How to apply
conference room Affairs Division Affairs engagement (Shinagawa) Conference room rental information (122.3 KB) As shown on the left
classroom Academic Affairs Section (Shinagawa) Classroom rental information (248.3 KB) As shown on the left
Gymnasium, cafeteria, auditorium Student Life Section, Student Services Division (Shinagawa) Information on renting physical education facilities (216 KB)
Availability of physical education facilities (348 KB)
Usage reservation application form
Application acceptance period:
20:9 on the 00th of every month to 22:11 on the 59nd of each month

Etchujima Campus

Facility The office in charge Procedures, capacity, fees, etc. How to apply
Conference room/Auditorium Etchujima District Office Manager (Etchujima) Meeting room and auditorium rental information (109.5 KB) As shown on the left
classroom Education Support Section, Etchujima District Office (Etchujima) Classroom rental information (325.3 KB) As shown on the left
Gymnasium, cafeteria, assembly room Etchujima District Office Student Support Section (Etchujima) Rental guidance for sports facilities, etc. (214.6 KB)
Availability of physical education facilities (99.6 KB)
Usage reservation application form
Application acceptance period:
20:9 on the 00th of every month to 22:11 on the 59nd of each month

3.Local child discount application

〇Facility users are groups organized by children of elementary school age or younger in the areas surrounding the Shinagawa and Etchujima campuses, and if they use the facilities of the university for their activities, they can receive a discount on the facility usage fee.If you wish to receive a discount, please check the following conditions and submit the application documents to the person in charge of the rental facility.

  • Applicants must be amateur groups whose activities are systematically, systematically and regularly operated.
  • It is intended for use by children of elementary school age or younger who live in the vicinity of each campus or attend kindergarten or school, and the number of children participating must be 10 or more.

[Area around each campus]
The Shinagawa Campus is located in Minato-ku and Shinagawa-ku, Tokyo.
Etchujima Campus is located in Koto-ku and Chuo-ku, Tokyo.

〇Regarding this application, if the university judges that the conditions are met and approves it, a registration number will be given along with the date of approval.After registration, you can receive a discount by entering the registration number (required) in the “7.

〇 New applications (registration procedures) are accepted at any time. (It takes about one week from application to registration approval.)

* The registration approval validity period is from July 7st or the date of approval to the following June 1th, and is valid for a maximum of one year. Please note that it will become invalid after June 6th of each year, so if you wish to receive a discount after July 30st, you will need to apply for renewal.

Applications for renewal will be accepted from mid-May.

〇Application documents

*Even after being granted permission, we may ask you to submit the application documents again for confirmation.
*The submitted name list will not be used for purposes other than confirming the contents of this application.
*Discounts may be canceled if there is a discrepancy between the content of the application and the actual use.
*Please note that discount details are subject to change without notice.

About cases where facility rental is not permitted

  • If it violates laws or public order and morals
  • When there is a risk of damaging rental facilities (including incidental facilities)
  • If the content is strongly political, religious, or ideological, and is not suitable for the university as a place of education and research.
  • If it causes trouble to other users on campus, in the neighborhood, or in rental facilities
  • When the purpose of profit is significant
  • In addition, when there is a problem with management and operation

Liability for damages

The University shall not be held responsible for any damage caused to the University or a third party (including the University's students, faculty and staff) due to reasons attributable to the user.The user is responsible for compensating for the damage.
In addition, please note that we may refuse to lend out the facilities of the university in the future.

Waiver of Claims for Benefit Expenses, etc.

Please note that even if permission is given, permission may be canceled or changed due to circumstances of the university.
In the event that the usage permit is revoked, the person who has been licensed to use the property, etc., shall be responsible for the expenses, etc. shall not claim reimbursement for

About strict observance

  • It may not be used for any other purpose or subleased to others.
  • Please do not use or move equipment or tools in the rental facility without permission.
  • Please use the equipment and tools of the rental facility within the scope of permission.If you move it, please return it to its original position immediately after use.
  • Do not change the wiring or settings of AV equipment, etc.If you need to check the operation in advance, please contact the person in charge of each application reception.
  • For eating and drinking, please check the facility rental guidelines to prevent the spread of new coronavirus infections.
  • Smoking is prohibited on campus, including indoors, except in designated outdoor smoking areas.Smoking while walking, smoking outside designated smoking areas, and littering cigarette butts are strictly prohibited.
  • The use of loud sound equipment and speakers is prohibited.
  • If you receive complaints from other facility users, university staff, or local residents, please stop using them immediately.
  • Unauthorized entry to facilities other than authorized facilities is prohibited.
  • It is prohibited to bring in and use flammables, dangerous materials, etc.
  • Please also strictly follow the instructions given by each application receptionist.
  • Please do not alter or remove the bulletin boards on campus.In addition, please do not install bulletin boards without permission.If posters, etc. interfere with the use of the facility, please consult with the person in charge in advance.
  • Users are responsible for taking out any garbage that is generated.
  • If the desk, floor, toilet, etc. become dirty, the user is responsible for cleaning it.
  • On-campus parking is only permitted for the number of vehicles that have been pre-approved for carrying in luggage, etc.No other vehicles are permitted to use the on-campus parking lot.If there are users who come to the school by car, group leaders should inform them to use off-campus paid parking lots.
  • If you come to school by bicycle, please park it in the designated bicycle parking space.
  • Roller skates, kickboards, skateboards, and running bikes (striders) are prohibited on the premises.
  • When using the facilities with children, please ensure that they are accompanied by an adult (guardian, group leader, etc.) and never allow children to act alone.
  • Please return promptly after using the facility.

* If you do not follow the above strict observance, we may refuse to use it in the future.

Matters to keep in mind

  • Our university lends out facilities such as classrooms, gymnasiums, and grounds to external parties to the extent that it does not interfere with education and research.
    We strive to maintain the environmental conditions at each facility at a level that does not interfere with education, research, etc.
    Since this facility is not primarily for rental purposes, please be aware that there may be situations where we may not be able to meet the level of desire of those who use the facility, especially for mowing grass at baseball fields and grounds. please.
  • For advance reservations made more than two months in advance, please note that even if permission is granted, permission may be canceled if a campus event, etc. is scheduled.
  • Please pay attention to ensuring safety, such as confirming emergency exits and evacuation routes in advance.
  • The university is not responsible for accidents, injuries, theft, etc. on campus.
    Please manage your valuables responsibly and consider and cooperate in preventing accidents.
    In addition, if you request the police or an ambulance, please notify the guard station stationed at each campus immediately.
  • Do not damage or destroy facilities, equipment, etc.In the event of damage or loss, please report immediately to the person in charge of application reception during the daytime on weekdays, and to the guard station at night, weekends and holidays.

In addition, if the user damages or destroys facilities, equipment, etc., and if the user is responsible, the university will seek restoration and compensation for damages.

EMERGENCY CONTACT

  • In the event of an accident resulting in injury or death, a fire, etc., please take necessary measures such as reporting and emergency measures, and contact the university security guard without delay.
  • About the guardhouse
Location Contact
Shinagawa Campus Next to the main gate 03-5463-0376
Etchujima Campus School district next to the main gate 03-5245-7323

Related matters

Campus transportation information

Shinagawa Campus (4-5-7 Konan, Minato-ku, Tokyo)

  • About 10 minutes on foot from JR Line / Keikyu Line Shinagawa Station Konan Exit (East Exit)
  • About 15 minutes from Tokyo Monorail Tennozu Isle Station to the main gate across "Fureai Bridge"
  • About 20 minutes from Tennozu Isle Station on the Rinkai Line to the main gate after crossing the Fureai Bridge

Etchujima Campus (2-1-6 Etchujima, Koto-ku, Tokyo)

  • About 2 minutes on foot from JR Keiyo Line/Musashino Line Etchujima Station (local train only)
  • About 10 minutes on foot from Monzen-Nakacho Station on the Tozai Line and Oedo Line
  • About 10 minutes on foot from Tsukishima Station on the subway Yurakucho Line/Oedo Line